Click here to return to main Portfolio page
- Precision Inflation Devices
Client Need:
Customer needed a cost effective unit that would self inflate bags without popping them. The customer wanted to improve on the current off the shelf (OTS) product they were currently purchasing because it did not have a self inflation number read out and bags kept on popping generating very costly expenses.
3-D Engineering Solution:
3-D Engineering designed a cost effective unit that included a goal pressure and bag volume read out screen that never allowed bags to pop.
Results:
3-D Engineering developed process parameters, software algorithms, and techniques to accurately and reliably fill Airliners with precision. We built breadboards and prototypes.
- Snowboard Bridge System
Client Need:
A design and prototype based on a concept of an adjustable bridge, cover, and latch that manipulates the spring properties as well as storage space required for transportation.
3-D Engineering Solution:
3-D Engineering designed and built a functional as well as esthetically pleasing prototype. The design was backed by a finite element analysis of the design to establish maximum stress and determine a safety factor. Required documents including drawings, models, and test reports are vaulted and controlled.
Results:
The customer was very pleased to see his vision transferred into reality, and the comfort of knowing the extent of the analysis used to back the design.
- Pamphlet Dispensing Equipment
Client Need:
Improve packaging process, and improve handling time of pamphlets. Pamphlets were to be dispensed in a way that allowed ergonomic handling of the pamphlet to aid in the packaging process.
3-D Engineering Solution:
3-D Engineering designed and manufactured a semi automatic feeder for 2 specific types of packaging. The feeding system used an electric actuated and driven roll feeder as well as a pamphlet magazine driven by a constant force actuator.
Results:
3-D Engineering recommended a specific roller design that would provide accurate functionality. The customer was pleased with the results, and lead time of the project.